HOTSUN operates as a direct factory manufacturer of reliable sepa ties for concrete formwork systems. Featuring an integral two-section design, each tie combines a flat head with a round anchoring hole, a smooth formed neck transition, a solid round steel shaft, and a precision-threaded rod end with a clean black steel finish. Pairing effectively with formwork nuts, it provides dependable wall tie anchoring against pouring lateral load. As a direct factory, we support custom tooling based on technical drawings or samples, conduct 100% inspection before shipment, and maintain a typical lead time of about 7 to 25 days, delivering dependable fastening hardware for contractors and formwork rental distributors worldwide.
No account? Please register
If you are logging in for the first time, please click the"Register" button to complete the registration.