HOTSUN operates as a direct factory manufacturer of reliable B form ties for concrete formwork systems. Built as a multi-piece tie assembly, each tie features a partially threaded steel rod combined with a smooth unthreaded section, fitted with a hex nut and a curved clamp plate on the threaded end, and finished with a white plastic end plug to deliver dependable wall spacing and formwork clamping. As a direct factory, we support custom tooling tailored to customer samples or technical blueprints, conduct 100% inspection before shipment, and maintain a typical lead time of about 7 to 25 days, delivering dependable formwork tie hardware for contractors and equipment distributors worldwide.
No account? Please register
If you are logging in for the first time, please click the"Register" button to complete the registration.